Chapter IV — Protected Areas

Section 25A — Time-limit for completion of acquisition proceedings

Wild Life (Protection) Act, 1972 · Preview

[25A. Time-limit for completion of acquisition proceedings. --(1) The Collector shall, as far as possible, complete the proceedings under sections 19 to 25 (both inclusive), within a period of two…